The matter has been considered and to avoid harassment to the consumer, & accumulation of CT/PT Units in M.E. but field officers have brought in notice instances that the said instructions are not being applied in case of oil filled CT/PT Units. Labs khave been issued vide CC-49/2005 dated & again clarified vide CC-64/2005 dated. Instructions on the checking of accuracy of electro mechanical meters (single/three phase) being replaced with electronic meters in M.E. As a result the consumers are facing hardship. However in cases where oil filled 11KV CT/PT Units are being replaced, as a drive with pilferage resistant dry type 11KV CT/PT Units, no such instruction regarding their checking in ME Labs are there. Sub: Checking of accuracy of Oil filled 11KV CT/PT Units replaced with pilferage resistant dry Type 11KV CT/PT Units at Par with electro-mechanical meters (single /three phase ) being replaced with electronic meters,in ME Labs.Īs per Sales Regulation 112.4.2 the performance of the meter/metering equipment is to be got checked immediately from ME Organisation / Mobile metering testing squads for arriving at correct inference.

The estimate/sketches shall be verified and approved by Sr.XEN/DS personally.” Note: No establishment charges(16%) shall be recovered from the DS consumers. Urban pattern supply to the village dhanis/deras having a cluster of at least 15 houses, shall be provided by laying single-phase 11KV system at the cost of Board. It shall be ensured that such lines are not mis-utilised for running tubewell load. The requisite changes in the system for this purpose shall be made at the consumer’s cost.For extending this facility to individual dwelling units, the single-phase 11KV line shall be taken from the nearest tapping point and cost shall be recovered accordingly. Existing Industrial Consumers shall be given 24 hours urban pattern supply and metered on 11KV after shifting. Metering will be done on LT side and consumption shall be enhanced by 3% to cover the transformation losses.
KAIRON FORGINGS PVT LTD LUDHIANA INSTALL
24 Hours supply to Poultry farm(s) located in rural areas shall be released at 11 KV supply voltage and consumer shall be required to install his own transformer. In view of these instructions as per CC – 20/2004,the ESR Para 45.3.1 may be substituted to be read as under: –Įxisting consumers including poultry farm connections, except AP tubewells located beyond 500 metres of the phirni shall be entitled for Urban Pattern supply facility provided they pay the actual cost of works involved in the shifting of supply lines etc.

of Village Phirni could not be included in the updated Electricity Supply Regulations by amending the ESR 45.3.1 through oversight. Instructions issued vide CC-20/2004 dated 19.4.04 in respect of cluster of houses existing beyond 500 mtrs. Sub: Electricity Supply Regulations amended up to 31.12.04 ? issue of clarifications to regulation No.45 under Section-II-Release of Electricity Connection.